Submission to the Draft Addendum to the Medically Dependent Consumer (MDC) and the Vulnerable Consumers (VC) guidelines—The Electricity Authority (EA) | Maori Ministry

You are here

Submission to the Draft Addendum to the Medically Dependent Consumer (MDC) and the Vulnerable Consumers (VC) guidelines—The Electricity Authority (EA)

Overall, The Salvation Army are supportive of this draft addendum to these guidelines.
Electric plugs
Posted June 11, 2020

Executive Summary 

  1. The Salvation Army would not normally make a submission on this type of consultation. But given the importance of this review in the post-Covid environment, we wanted to add some brief comments based on our experience with our clients. Overall, we are supportive of this draft addendum to these guidelines. 

Photo by Murat Onder on Unsplash

MDC and VC, The Electricity Authority — The Salvation Army Submission

Type: PDF
Size: 209.95 KB
Date: 4 Aug 2020